Road repair work in Bengaluru has slowed down after over 200 engineers from five municipal corporations under the Greater Bengaluru Authority (GBA) were pulled from pothole work to conduct a state-wide socio-economic survey.
The diversion comes at a critical time, with the Chief Minister's October 31st deadline approaching and recent heavy rains damaging freshly asphalted roads.
The Chief Minister's 31st October deadline is looming.
Autor's summary: Bengaluru road repairs slowed due to caste survey.